Which milestones have been reached?

We’re in the home stretch of our BOX project!
đčOur âsanitaryâ and âcheck-inâ buildings are up and running
đčOur production is now composed by 100% recycled fibers
đčOur containerboard reel warehouse and loading bays are ready for commissioning.
đčOur colleagues are trained to drive and maintain our new facilities!
đčDrum pulper building: the drum and the facilities are in place. The piping work is almost complete and cabling work is in progress.
đčPM1:Â the lighting of the drying section is operational. Cabling, connection and piping work is accelerating.
đčWinder: the 1st commissioning phase has been completed.
đčWastewater treatment plant: commissioning should start next month!
Watch work’s progress on video
A picture is worth a thousand wordsâcheck out the video alongside to see the transformation and revolution happening at our site!
We canât wait to share the first tons of containerboard paper with you!
In the meantime, take a look at the photos below to get a glimpse of all the exciting updates from our BOX project!











This project has been financed with the support of the French government as part of the recovery plan run by the French agency ADEME and the European Union â NextGenerationEU