Which milestones have been reached?
We’re in the home stretch of our BOX project!
đčOur âsanitaryâ and âcheck-inâ buildings are up and running
đčOur production is now composed by 100% recycled fibers
đčOur containerboard reel warehouse and loading bays are ready for commissioning.
đčOur colleagues are trained to drive and maintain our new facilities!
đčDrum pulper building: the drum and the facilities are in place. The piping work is almost complete and cabling work is in progress.
đčPM1:Â the lighting of the drying section is operational. Cabling, connection and piping work is accelerating.
đčWinder: the 1st commissioning phase has been completed.
đčWastewater treatment plant: commissioning should start next month!
At the same time, we continue to produce newsprint on our second paper machine (PM2), which has a production capacity of 330,000 tonnes per year.
Progress report:
đ Want to see the scope of the work? Watch the video and photos below đ
Conversion of our site: before-and-after photosÂ
Our mill, seen from the sky:
This project has been financed with the support of the French government as part of the recovery plan run by the French agency ADEME and the European Union – NextGenerationEU